Pre-Construction Inspection
Check for cracks, breaks, aging, or deformation before installation. Discard damaged water stoppers to avoid compromising waterproof effectiveness.
Proper Fixing & Protection
Securely position the water stopper during formwork installation to prevent shifting or folding during concrete pouring. Avoid sharp impacts or punctures during construction.
Post-Construction Cleaning
Remove residual concrete, mortar, or debris from the surface after construction. Clean gently to avoid scratching or damaging the water stopper body.
Correct Storage
Store in a dry, ventilated, cool indoor area, away from direct sunlight, high temperatures, oils, and corrosive chemicals. Stack neatly to avoid compression, bending, or deformation.
With proper inspection, installation protection, cleaning, and storage, Formwork Water Stoppers maintain stable performance and long-term waterproof reliability for various concrete structures.







